KS Associates Inc. Logo
  • Services
  • Markets
  • Our Projects
  • News
  • About Us
  • Careers
  • Contact

Hopkins Road Bridge Replacement

  • Home
  • Our Projects

Hopkins Road Bridge Replacement 

KS Associates provided design services for the construction of the Hopkins Road Bridge replacement over Eagle Creek in Portage County. This design-build project involved design and construction of a 77-foot span pre-stressed concrete box beam bridge to replace an existing 57-foot span Pony Truss Bridge. KS Associates analyzed the new bridge and determined the pre-stressing strand spacing utilizing Merlin Dash and comparing the results with PCI manual design procedure. Our design team also detailed the bridge abutments, and provided the final bridge rating.

Construction Cost: $663,000.

Project Details

  • Location Garrettsville, Ohio
  • Market(s) Transportation
  • Owner Portage County

Services Provided

  • Bridge Design / Inspection

Related Projects

  • Cleveland Metroparks Wendy Park Bridge Cleveland, Ohio
  • Highbridge Road Bridge Replacement Vermilion, Ohio
  • ASD SR 0302 02.48 Bridge Widening, Deck Replacement Jackson Township, Ohio
KS Associates, Inc.
ELYRIA:
​260 Burns Road, Suite 100
Elyria, OH 44035
440.365.4730
CLEVELAND:
600 Superior Avenue East, Suite 1300
Cleveland, OH 44114
216.479.6807
  • facebook Icon
  • Twitter Icon
  • LinkedIn Logo
contactks@ksassociates.com



Copyright 2023. All rights reserved. Terms & Conditions