KS Associates Inc. Logo
  • Services
    • 3D Reality Capture
    • Coastal Engineering
    • Construction Admin./Inspection
    • Land Surveying
    • Municipal Engineering
    • Site Engineering
    • Water / Wastewater Engineering
  • Markets
    • Airport / Aviation
    • Coastal / Marine
    • Educational
    • Healthcare
    • Public Works
    • Residential
    • Retail / Commercial
    • Site Development
    • Transportation
    • Water / Wastewater / Stormwater
  • Our Projects
  • News
  • About Us
  • Careers
  • Contact

New Boat Docks at Heritage and Rivergate Parks Along the Cuyahoga River

  • Home
  • Our Projects

New Transient Docks at Rivergate Park Along the Cuyahoga River

Since 2014, KS Associates has been providing surveying and marine engineering services for waterfront initiatives throughout the Cleveland Metroparks district. We have been helping Cleveland Metroparks achieve its goals of reinventing public spaces as safe, clean, and green parks. From 2014 to 2019, KS Associates was under contract for the Professional Design Services Contract 2014-2019. In 2020, KS Associates signed its second five-year contract, the Coastal, Shoreline, Riverfront Professional Design Services Contract 2020-2024. The completion of the second contract will mark a decade-long partnership between KS Associates and Cleveland Metroparks.

Under the current contract, KS Coastal Engineers designed new transient docks and access ramps at Heritage Park and Rivergate Park along the Cuyahoga River:

Heritage Park Waterfront Improvements and Boat Docks – KS Coastal Engineers designed new transient docks, access ramps, concrete retaining wall, and an armor stone revetment along the Cuyahoga River at Heritage Park. The project included stone shore protection, dredging, and landside improvements. The scope of services included surveying, dredge material sampling and testing, above ground and underwater structural inspections, preliminary design, permitting, and preparing construction documents. 

Merwin’s Wharf Boat Docks at Rivergate Park – KS Associates designed new transient docks, fixed ramps, and a gangway access ramps along the Cuyahoga River at Merwin’s Wharf at Rivergate Park. The scope of services included surveying, dredge material sampling and testing, above-ground and underwater structural inspections, preliminary design, permitting, preparing construction documents, and construction services. 

The docks are open for the public’s enjoyment.  

Project Details

  • Location Cleveland, Ohio
  • Market(s) Coastal / Marine
  • Owner Cleveland Metroparks

Services Provided

  • Coastal Engineering
  • Construction Admin./Inspection
  • Land Surveying

Related Projects

  • Armor Stone Revetment at LCDU Bacon Road Water Treatment Facility Painesville, Ohio
  • Scheeff East Point Preserve Nature-Based Shoreline South Bass Island, Ohio
  • Lakeside Chautauqua Armor Stone Revetment Lakeside, Ohio
KS Associates, Inc.
ELYRIA:
​260 Burns Road, Suite 100
Elyria, OH 44035
440.365.4730
CLEVELAND:
600 Superior Avenue East, Suite 1300
Cleveland, OH 44114
216.479.6807
  • facebook Icon
  • LinkedIn Logo
[email protected]



Copyright 2025. All rights reserved. Terms & Conditions