KS Associates delivered a compelling presentation entitled “Wendy Park Bridge / Reconnecting Cleveland’s Lakefront (TIGER Project-PID 104804)" on Wednesday, October 27, 2021, at 8:00 a.m.
Read More October 20, 2021KS Associates was the lead design engineer for project. The bridge provides a long-awaited route for cyclists and pedestrians to reach the Lake Erie shoreline from the Towpath Trail, the region’s 101-mile hike-and-bike trail system.
Read More June 24, 2021KS Associates can be an even more valuable team member by helping to fulfill SBE and WBE goals for certain contracts.
Read More June 15, 2021The Port of Cleveland Bulk Terminal (CBT) is one of the region’s premier multimodal transportation facilities. KS Associates led an $8.4 million capital improvement at the CBT, including the design of a new 1,200-foot-long bulkhead.
Read More May 21, 2021Christopher is a Professional Engineer with more than 20 years of experience in the specialized discipline of coastal engineering. Before moving back to Ohio, Christopher had been designing and managing major port and shore protection projects along the Pacific Ocean, Atlantic Ocean, and Gulf of Mexico.
Read More April 17, 2020