KS Associates Inc. Logo
  • Services
    • 3D Reality Capture
    • Coastal Engineering
    • Construction Admin./Inspection
    • Land Surveying
    • Municipal Engineering
    • Site Engineering
    • Water / Wastewater Engineering
  • Markets
    • Airport / Aviation
    • Coastal / Marine
    • Educational
    • Healthcare
    • Public Works
    • Residential
    • Retail / Commercial
    • Site Development
    • Transportation
    • Water / Wastewater / Stormwater
  • Our Projects
  • News
  • About Us
  • Careers
  • Contact

Replace Water Main on Douglas Street Under Norfolk Southern Railroad

  • Home
  • Our Projects

The City of Vermilion experienced a water main break on Douglas Street within the Norfolk Southern Railroad Right-of-Way, near active tracks. KS Associates performed detailed design and secured all necessary permits to replace this critical section of water main.

KS Associates assisted the Water Department in isolating the broken section of water main to avoid compromising the railroad tracks, then worked with Norfolk Southern Railroad to expedite the right of entry. After the entry permit was secured, the field survey was performed.

KS Associates prepared the Railroad Application for Pipe Occupancy as well as engineering drawings for an 8-inch ductile iron pipe installed within a 16-inch steel casing pipe. The water main casing was installed by jack and bore method across the Right-of-Way. KS Associates also assisted the City with bidding, and represented the City during construction, providing crucial communications among the contractor, construction inspection firm, and the City.

The Contractor took great care to avoid two fiber optic cables that were incorrectly field marked by the utilities. The Contractor also encountered an undocumented 4-inch water service, as well as a damaged storm sewer. KS Associates worked efficiently to avoid delay claims by communicating with the City Administration and City Council, and getting change orders approved in advance of construction activities. Construction was completed in 2016. Construction Cost: $109,189.

Project Details

  • Location Vermilion, Ohio
  • Market(s) Public Works, Water / Wastewater / Stormwater
  • Owner The City of Vermilion, Ohio

Services Provided

  • Water / Wastewater Engineering
  • Municipal Engineering

Related Projects

  • CLE North Airfield Storm Water Improvements Cleveland, Ohio
  • Main Street Green Infrastructure Enhancement and Water Main Replacement Vermilion, Ohio
  • Ranger Way Extension and Waterline North Ridgeville, Ohio
KS Associates, Inc.
ELYRIA:
​260 Burns Road, Suite 100
Elyria, OH 44035
440.365.4730
CLEVELAND:
600 Superior Avenue East, Suite 1300
Cleveland, OH 44114
216.479.6807
  • facebook Icon
  • LinkedIn Logo
[email protected]



Copyright 2025. All rights reserved. Terms & Conditions