KS Associates Inc. Logo
  • Services
    • 3D Reality Capture
    • Coastal Engineering
    • Construction Admin./Inspection
    • Land Surveying
    • Municipal Engineering
    • Site Engineering
    • Water / Wastewater Engineering
  • Markets
    • Airport / Aviation
    • Coastal / Marine
    • Educational
    • Healthcare
    • Public Works
    • Residential
    • Retail / Commercial
    • Site Development
    • Transportation
    • Water / Wastewater / Stormwater
  • Our Projects
  • News
  • About Us
  • Careers
  • Contact

MWCD Park Master Plan Implementation

  • Home
  • Our Projects

KS Associates is providing design and engineering services on individual park design teams for Muskingum Watershed Conservancy District’s (MWCD) Park Master Plan Implementation Program. Design development, final design, and construction of each project identified in the park Master Plan will be completed in phases. KS Associates’ work includes:

Charles Mill Lake Park – KS Associates teamed with Environmental Design Group (EDG) and has provided 30% design for proposed waterfront improvements throughout the park, including new floating docks, fishing piers, and boat ramps. The construction of the proposed waterfront improvements will be phased with associated park and campground improvements from 2016 to 2021. 

Seneca Lake Park – KS Associates is on a team with GPD to design waterfront improvements at Seneca Lake Park. Proposed improvements include: an updated marina layout, dredging, a marina boardwalk promenade, shore protection, floating docks, boat ramps, kayak camping platforms, a fishing pier, and beach stabilization structures. The construction of the improvements will be phased with associated park and campground improvements from 2016 to 2023. The first phase, including a boat ramp and courtesy docks, has been constructed. 

Tappan Lake Park – KS Associates teamed with DLZ and Domokur Architects and has provided 30% design for proposed waterfront improvements throughout the park, including new floating docks and a floating rental concession building. The construction of the proposed waterfront improvements will be phased with associated park and campground improvements from 2016 to 2021. 

Project Details

  • Location Muskingum County, Ohio
  • Market(s) Coastal / Marine
  • Owner Muskingum Watershed Conservancy District

Services Provided

  • Coastal Engineering

Related Projects

  • Armor Stone Revetment at LCDU Bacon Road Water Treatment Facility Painesville, Ohio
  • Scheeff East Point Preserve Nature-Based Shoreline South Bass Island, Ohio
  • Lakeside Chautauqua Armor Stone Revetment Lakeside, Ohio
KS Associates, Inc.
ELYRIA:
​260 Burns Road, Suite 100
Elyria, OH 44035
440.365.4730
CLEVELAND:
600 Superior Avenue East, Suite 1300
Cleveland, OH 44114
216.479.6807
  • facebook Icon
  • LinkedIn Logo
[email protected]



Copyright 2025. All rights reserved. Terms & Conditions